Erection

Erection of the PEB can be completed is within very less time because all the components are pre fabricated in the factory and are engineered for onsite assembly. These components are also premarked for easy identification and to accelerate the erection and reduce the installation time of the whole building.

The Sequence of installation of the building is as shown below.

Anchorbolt Foundation
1.   ANCHORBOLT FOUNDATION
 
Fixing of Purlins
3.   FIXING OF PURLINS
 
Fixing of crane in shed
5.   FIXING OF CRANE IN SHED
 
Fixing of insualted wall sheeting
7.   FIXING OF INSUALTED WALL SHEETING
Erection of rafter columns
2.   ERECTION OF RAFTER & COLUMNS
 
Fixing of roof bracing
4.   FIXING OF ROOF BRACING
 
Fixing of roof sheeting
6.   FIXING OF ROOF SHEETING
 
Completed Building
8.   COMPLETED BUILDING
MPIL Project Gallery

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 

Pre engineered building system | Pre painted roof sheets colour coated factory shed | Steel fabrication in India | PEB manufacturer India | Structural steel manufacturer | Deck manufacturers India
roofing manufacturers | steel solution provider | steel plant structure | Multi-storey steel building | PEB manufacturer | Pre engineered building India | Building Components | Metal Deck System
Metal Building System | Structural Steel | Heavy Fabricated Structure | Plate Welded Beams | Self storage buildings | End wall metal building | Steel sheet | Steel company | Building Companies | Turnkey solutions | C and Z channels | Pre coated steel sheets | Industrial warehouses