Key difference are :- In MPIL PEB System the complete steel buildings package is delivered to site from a single supplier as a fully finished product. This includes the structural steel, cladding system and building accessories. Site erection is fast and simple - just bolting together the various building components as per the erection drawings provided. No site fabrication or welding is involved. Results in significant saving in construction time and superior quality compared to conventional steel construction.
PEB System is highly efficient in design due to synergy between building components. Primary members are made of tapered built-up sections and roof/wall secondary members from cold rolled sections designed as continues beams. High strength steel is used. All structural elements are fully optimized by the proprietary computerized design program. Significant reductions in dead load reactions to foundations.
PEB System is highly efficient in design due to synergy between building components. Primary members are made of tapered built-up sections and roof/wall secondary members from cold rolled sections designed as continues beams. High strength steel is used. All structural elements are fully optimized by the proprietary computerized design program. Significant reductions in dead load reactions to foundations.

The main advantages are:
- Saving in construction time : About 30-50% saving in total project schedule due to fast delivery and quick site erection.
- Reduction in project cost : Cost savings primarily result from above time saving on the Project. This also results in earlier realization of revenue to owner on a commercial project.
- Large clear spans : Buildings can be supplied in clear spans up to 90 m Particularly suitable for aircraft hangers, sports facilities, etc…
- Flexibility in expansion : Buildings can be designed for future expansion in length, width and height
- Superior quality : Complete manufacturing is done in plant to ISO 9001 quality assurance standards.
- Low Maintenance : High quality paint systems are available for steel and cladding to provided a long maintenance free service life.
- Energy efficiency : Buildings are supplied with roof and wall insulation to reduce energy costs and improve comfort level inside the building.
- Architectural versatility : Buildings can be supplied with special fascias, canopies, curved eaves and other architectural features required on the project.
- Single source responsibility : As the complete steel buildings package is supplied from a single source (MPIL) client is assured of proper interface between all components resulting in a weather tight building with good appearance.
- Saving in construction time : About 30-50% saving in total project schedule due to fast delivery and quick site erection.
- Reduction in project cost : Cost savings primarily result from above time saving on the Project. This also results in earlier realization of revenue to owner on a commercial project.
- Large clear spans : Buildings can be supplied in clear spans up to 90 m Particularly suitable for aircraft hangers, sports facilities, etc…
- Flexibility in expansion : Buildings can be designed for future expansion in length, width and height
- Superior quality : Complete manufacturing is done in plant to ISO 9001 quality assurance standards.
- Low Maintenance : High quality paint systems are available for steel and cladding to provided a long maintenance free service life.
- Energy efficiency : Buildings are supplied with roof and wall insulation to reduce energy costs and improve comfort level inside the building.
- Architectural versatility : Buildings can be supplied with special fascias, canopies, curved eaves and other architectural features required on the project.
- Single source responsibility : As the complete steel buildings package is supplied from a single source (MPIL) client is assured of proper interface between all components resulting in a weather tight building with good appearance.

MPIL can supply the complete steel portion including standard accessories. Accessories that are not manufactured by MPIL can be supplied as buy outs (Eg Rolling Up Doors, Cranes etc ..) and included in MPIL scope of supply.
For mezzanine floors, MPIL will provide the steel framing and steel deck to receive in site concrete slab. If flooring is of pre-cast concrete panels, MPIL will provide the floor supports beams.
For mezzanine floors, MPIL will provide the steel framing and steel deck to receive in site concrete slab. If flooring is of pre-cast concrete panels, MPIL will provide the floor supports beams.

No. MPIL can provide a small car park shed to a massive industrial complex comprising thousands of square meters of covered area. However for shipment, a minimum one-truck load would be economical.

The saving would be basically due to less number of column foundations due to large spans and bay spacing plus reduction in column reactions due to less dead load of steel. It is not possible to quantify the cost savings as it would vary by type of project.

MPIL Standard cladding thickness is 26G and 24G. These are available in stock in various colors. Other thick nesses can be offered as special order with comparatively longer delivery.

No. MPIL will provide column reactions and base plate details of Anchor Bolt plan drawing. It is the responsibility of the civil consultant to design the foundations to support the column reactions.

Yes. MPIL will provide design calculations for the building whenever requested for approval by consultant / client.

All field connections are only by bolting. There is absolutely no site welding required. This is one of the major advantages with MPIL system, which considerably reduces the time for site erection.

The transport component would depend on the distance of the job site from MPIL plant. Due to the reduced steel weight with MPIL system and the nesting properties of secondary and sheeting components, the freight cost would be less than conventional construction.

As MPIL buildings are assembled at site by bolting, the units can b dismantled and shifted to new locations and reassembled. MPIL can also provide small portable units which can be transported on trucks in one piece from place to place.
12.

MPIL system is ideally suited for warehouse construction. We have supplied several thousand warehouses in the gulf and hundreds in India for the state and private warehousing corporations. Due to the significant optimization capabilities of the MPIL system and the quick delivery, the customer will benefit from cost and time savings on the project.

MPIL provides detailed erection drawings, erection procedures manual and free technical assistance through visit of MPIL Technical Representative to the site during erection. MPIL will recommend to client the services of our certified builders who are trained to carry out erection of MPIL Buildings.
14.

Yes, MPIL provides steel deck over steel floor framing to received cast in site slab. The steel deck acts as a shuttering to support the wet concrete. The slab should be reinforced and designed for the total floor load.

Yes, MPIL will submit detailed design calculations and approval drawings to client for approval prior to fabrication of the building. All comments received from client on the approval drawings are incorporated by MPIL in the final Erection Drawings and in fabrication.

MPIL provides maintenance instructions for the supplied buildings. Generally maintenance is limited to periodic checking and tightening of bolts and cleaning roof and gutters. Also accessories moving parts need periodic maintenance. Thus we can say MPIL Buildings are almost maintenance free.